
HUNG YEN GROUP
PROJECT: KIM ĐONG, DANG LE AND CHINH NGHIA INDUSTRIAL CLUSTER
HUNG YEN PROVINCE OVERVIEW
1
|
Area
|
930.2 km2
|
2
|
Population
|
1,269,090 people
|
3
|
Average temperature
|
23.2 o
|
4
|
Average humidity
|
85-87%
|
5
|
The average rain fall
|
1.450 – 1.652mm
|
KIM ĐONG, ĐANG LE, CHINH NGHIA INDUSTRIAL CLUSTER OVERVIEW
Investor
|
HUNG YEN INVESTMENT AND DEVELOPMENT CORPORATION
|
The total area of 3 industrial clusters
|
225ha (Kim Đong: 75ha, Đang Le: 75ha and Chinh Nghia: 75ha)
|
Operating time
|
50years
|

GEOGRAPHICAL LOCATION OF INDUSTRIAL CLUSTER
1
|
Contiguity
|
HA NOI capital, Hai Duonng province
|
2
|
The distance from Ha Noi
|
50km
|
3
|
Transportation
|
Located in the Northern key economic region: Ha Noi - Hai Phong - Quang Ninh
|
|
The road
|
+ Ha Noi – Hai Phong expressway
+ Cau Gie – Ninh Binh expressway
|
|
The rail
|
+ Ha Noi – Hai Phong
|
|
Seaport
|
- Far from Hai Phong seaport: 92km
- Far from Cai Lan seaport: 130km
|
|
Far from Noi Bai airport
|
70km
|
|
Border gate
|
- Far from Lang Sơn (Tan Thanh) border gate: 210km
|
.png)
1
|
Land already has infrastructure (VAT excluded)
|
Please contact us for updated price
|
2
|
Service charge (clean internal roads, trees,security...)
|
10.500VND/m2/year
|
3
|
Infrastructure maintenance fee
|
|
4
|
Electricity price (VND/KWH)
From 22KV to under 110KV
|
Belonging EVN electricity price, apply from March 20th, 2019 (VAT excluded)
|
5
|
Normal hour
|
1,555VND
|
|
4:00 – 9:30 (Mon - Sat)
|
|
11:30 – 17:00 (Mon - Sat)
|
|
20:00 – 22:00 (Mon - Sat)
|
|
4:00 – 22:00 (CN)
|
6
|
Rush hour:
|
2,871VND
|
|
9:00 – 11:30 (Mon - Sat)
|
|
17:00-22:00 (Mon - Sat)
|
|
Sunday
|
7
|
Peak hour:
|
1,007 VND
|
|
22:00 – 4:00 (Mon – Sun)
|
8
|
Water price (VAT included)
|
Expected 12,400vnd/m3
|
9
|
Cost of wastewater treatment (VAT excluded)
|
Expected 11,300vnd/m3
|
10
|
Fees for other services (telecommunication, phone, fax, internet…)
|
Belonging to suppliers’ price
|
11
|
Transport fee
|
Price excluded VAT and loading and unloading fees for both ends
Prices may change from time to time
|
|
To Lang Son
|
205USD/20’DC
223USD/40’DC
|
|
To Hai Phong seaport
|
163USD/20’DC
171USD/40’DC
|
|
To Cai Lan seaport
|
184USD/20’DC
193USD/40’DC
|
1
|
Competitive advantage
|
- Convenient transportation system, geographical location
- Modern infrastructure system
- Abandon human resources
- Support from local government
- Competitive price
|
2
|
Traffic system
|
|
|
Expressway link
|
4 lanes
|
|
Area planning roads
|
2 lanes
|
|
Internal roads and collection roads
|
2 lanes
|
3
|
The infrastructure
|
|
|
Electricity system
|
- Connecting with Kim Dong II 110/22KV station
- 22KV power line to each land lot
|
|
Water
|
Water supply company with capacity of 25,000m3/day
|
|
Waste water/waste treatment system
|
Wastewater treatment plant with an expected capacity of 5,700m3/day
|
|
Telecommunications system
|
Already
|
|
Fire protection system
|
- There is a fire hydrant system arranged along the roads in the industrial cluster
|
|
Green tree, public works
|
- Occupying 27 - 30% of the industrial land area
|

REGULATIONS ON CONSTRUCTION IN INDUSTRIAL CLUSTER
1
|
Minimum elevation of the factory floor above sea level
|
+5.00m
|
2
|
Factory construction area
|
Up to 70% of industrial land area
|
|
Factory fence
|
Maximum height of fence: 2.60m. The design rate of open space of the facade fence is regulated to be at least 60% from a height of 0.6m or more.
|
3
|
Minimum distance from the fence to the construction scope
|
+6.0m
|
4
|
Minimum distance from the internal road to constrution range
|
+6.0m
|
1
|
Customs
|
20km far from Hung Yen customs branch
|
2
|
Bank
|
SHB, BIDV, VCB, Sacombank, Techcombank, Vietinbank
|
3
|
House for workers
|
Most of the workers live in the area around the industrial cluster, so they can take care of their own accommodation
|
4
|
Hospital
|
7km far from Kim Dong district Medical center
|
5
|
Skill school
|
There are 5 popular skill schools in Hung Yen province
Training professions: electromechanical, engineering, informatics, technology, accounting, …
|
1
|
Labor source
|
Hung Yen province’s population: 1,269,090 people:
- Countryside: 83.47%
- Urban: 16.53%
People of working age: 65%
|
2
|
Wage
|
|
|
Unskilled labor (minimum wage)
|
3,430,000VND/person/month
|
|
Actual average salary
|
8,500,000VND/person/month
|
|
Engineer/office worker
|
9,000,0000VND – 10,000,000VND/person/month
|
|
Manager
|
12,000,0000VND/person/month and above
|
3
|
Insurance
|
|
|
Social insurance
|
25% (enterprise: 17%, laborer: 8%)
|
|
Health insurance
|
4.5% (enterprise: 3%, laborer: 1.5%)
|
|
Unemployment insurance
|
1% (enterprise: 0%, laborer: 2%)
|
*INVESTMENT PREFERENTIAL POLICIES
1
|
Incentives on corporate income tax (For industrial cluster)
|
Exemption from annual land rent for 07 years (Article 27 Decree 68/2017/NĐ-CP)
|
2
|
Incentives on corporate income tax
|
Preferential tax rate of 17% for 10 years (Article 19, VBHN No.66/VBHN – BTC); Tax exemption for 2 years and reduction of 50% of tax payable for the next 4 years (Article 20, VBHN No. 66/VBHN – BTC)
|
|
Import – export tax exemption
|
To enjoy import – export tax on raw materials, suppliers and components that cannot be domestically produced (if condtions are met) according to the provisions of the import – export tax law and decree 134/2016/ND-CP guiding the law on export law, import law
|
|
VAT exemption
|
|
|
Tax on transferring profits abroad
|
|
|
Support from infrastructure development company
|
- Support in business registration procedures; apply for an investment registration certificate
- Support to do some post – investment procedures
- Support in applying for a land use right certificate
- Support job posting
- Support in applying for construction permits, fire prevention and fighting, DTM or environmental protection commitments
- Consulting and recommending competent design and contruction contrators
|
PROCEDURES:
Diagram 1: Procedures for Investment Certificate
.png)
Diagram 2: Procedures for Land Use Right Certificate
.png)
|
|
SALES DEPARTMENT
|
|
|
Tel: (+84) 393100008
|
|
Email: sales@hungyengroup.com
|