Kim Dong IC

HUNG YEN GROUP
PROJECT: KIM ĐONG, DANG LE AND CHINH NGHIA INDUSTRIAL CLUSTER

HUNG YEN PROVINCE OVERVIEW

1

Area

930.2 km2

2

Population

1,269,090 people

3

Average temperature

23.2 o

4

Average humidity

85-87%

5

The average rain fall

1.450 – 1.652mm

KIM ĐONG, ĐANG LE, CHINH NGHIA INDUSTRIAL CLUSTER OVERVIEW

Investor

HUNG YEN INVESTMENT AND DEVELOPMENT CORPORATION

The total area of 3 industrial clusters

225ha  (Kim Đong: 75ha, Đang Le: 75ha and Chinh Nghia: 75ha)

Operating time

50years

 

 

GEOGRAPHICAL LOCATION OF INDUSTRIAL CLUSTER

1

Contiguity

HA NOI capital, Hai Duonng province

2

The distance from Ha Noi

50km

3

Transportation

Located in the Northern key economic region: Ha Noi - Hai Phong - Quang Ninh

 

The road

+ Ha Noi – Hai Phong expressway

+ Cau Gie  – Ninh Binh expressway

 

The rail

+ Ha Noi – Hai Phong

 

Seaport

- Far from Hai Phong seaport: 92km

- Far from Cai Lan seaport: 130km

 

Far from Noi Bai airport

70km

 

Border gate

- Far from Lang Sơn (Tan Thanh) border gate: 210km

 

 

PRICE AND FEE

1

Land already has infrastructure (VAT excluded)

Please contact us for updated price 

2

Service charge (clean internal roads, trees,security...)

10.500VND/m2/year

3

Infrastructure maintenance fee

 

4

Electricity price (VND/KWH)

From 22KV to under 110KV

Belonging EVN electricity price, apply from March 20th, 2019 (VAT excluded)

5

Normal hour

1,555VND

 

4:00 – 9:30 (Mon - Sat)

 

11:30 – 17:00 (Mon - Sat)

 

20:00 – 22:00 (Mon - Sat)

 

4:00 – 22:00 (CN)

6

Rush hour:

2,871VND

 

9:00 – 11:30 (Mon - Sat)

 

17:00-22:00 (Mon - Sat)

 

Sunday

7

Peak hour:

1,007 VND

 

22:00 – 4:00 (Mon – Sun)

8

Water price (VAT included)

Expected 12,400vnd/m3

9

Cost of wastewater treatment (VAT excluded)

Expected 11,300vnd/m3

10

Fees for other services (telecommunication, phone, fax, internet…)

Belonging to suppliers’ price

11

Transport fee

Price excluded VAT and loading and unloading fees for both ends

Prices may change from time to time

 

To Lang Son

205USD/20’DC

223USD/40’DC

 

To Hai Phong seaport

163USD/20’DC

171USD/40’DC


 

To Cai Lan seaport

184USD/20’DC

193USD/40’DC

 

COMPETITIVE ADVANTAGE

1

Competitive advantage

- Convenient transportation system, geographical location

- Modern infrastructure system

- Abandon human resources

- Support from local government

- Competitive price

2

Traffic system

 

 

Expressway link

4 lanes

 

Area planning roads

2 lanes

 

Internal roads and collection roads

2 lanes

3

The infrastructure

 

 

Electricity system

- Connecting with Kim Dong II 110/22KV station

- 22KV power line to each land lot

 

Water

Water supply company with capacity of 25,000m3/day

 

Waste water/waste treatment system

Wastewater treatment plant with an expected capacity of 5,700m3/day

 

Telecommunications system

Already

 

Fire protection system

- There is a fire hydrant system arranged along the roads in the industrial cluster

 

Green tree, public works

- Occupying 27 - 30% of the industrial land area

 

REGULATIONS ON CONSTRUCTION IN INDUSTRIAL CLUSTER

1

Minimum elevation of the factory floor above sea level

+5.00m

2

Factory construction area

Up to 70% of industrial land area

 

Factory fence

Maximum height of fence: 2.60m. The design rate of open space of the facade fence is regulated to be at least 60% from a height of 0.6m or more.

3

Minimum distance from the fence to the construction scope

+6.0m

4

Minimum distance from the internal road to constrution range

+6.0m

THE OTHER SERVICES

1

Customs

20km far from Hung Yen customs branch

2

Bank

SHB, BIDV, VCB, Sacombank, Techcombank, Vietinbank

3

House for workers

Most of the workers live in the area around the industrial cluster, so they can take care of their own accommodation

4

Hospital

7km far from Kim Dong district Medical center

5

Skill school

There are 5 popular skill schools in Hung Yen province

Training professions: electromechanical, engineering, informatics, technology, accounting, …

LABOR      

1

Labor source

Hung Yen province’s population: 1,269,090 people:

- Countryside: 83.47%

- Urban: 16.53%

People of working age: 65%

2

Wage

 

 

Unskilled labor (minimum wage)

3,430,000VND/person/month

 

Actual average salary

8,500,000VND/person/month

 

Engineer/office worker

9,000,0000VND – 10,000,000VND/person/month

 

Manager

12,000,0000VND/person/month and above

3

Insurance

 

 

Social insurance

25% (enterprise: 17%, laborer: 8%)

 

Health insurance

4.5% (enterprise: 3%, laborer: 1.5%)

 

Unemployment insurance

1% (enterprise: 0%, laborer: 2%)

*INVESTMENT PREFERENTIAL POLICIES

1

Incentives on corporate income tax (For industrial cluster)

Exemption from annual land rent for 07 years (Article 27 Decree 68/2017/NĐ-CP)

2

Incentives on corporate income tax

Preferential tax rate of 17% for 10 years (Article 19, VBHN No.66/VBHN – BTC); Tax exemption for 2 years and reduction of 50% of tax payable for the next 4 years (Article 20, VBHN No. 66/VBHN – BTC)

 

Import – export tax exemption

To enjoy import – export tax on raw materials, suppliers and components that cannot be domestically produced (if condtions are met) according to the provisions of the import – export tax law and decree 134/2016/ND-CP guiding the law on export law, import law

 

VAT exemption

 

 

Tax on transferring profits abroad

 

 

Support from infrastructure development company

- Support in business registration procedures; apply for an investment registration certificate

- Support to do some post – investment procedures

- Support in applying for a land use right certificate

- Support job posting

- Support in applying for construction permits, fire prevention and fighting, DTM or environmental protection commitments

- Consulting and recommending competent design and contruction contrators

*INVESTMENT PROCESS    

PROCEDURES:

Diagram 1: Procedures for Investment Certificate

Diagram 2: Procedures for Land Use Right Certificate

*CONTACT INFORMATION

 

 

SALES DEPARTMENT

 

 

Tel: (+84) 393100008

 

Email: sales@hungyengroup.com

         

 
   

 

Dự án khác
Zalo